chain grate boiler speed reducer —YueXin
chain grate boiler speed reducer —YueXin
chain grate boiler speed reducer —YueXin
chain grate boiler speed reducer —YueXin
chain grate boiler speed reducer —YueXin
chain grate boiler speed reducer —YueXin
chain grate boiler speed reducer —YueXin
  • chain grate boiler speed reducer —YueXin
  • chain grate boiler speed reducer —YueXin
  • chain grate boiler speed reducer —YueXin
  • chain grate boiler speed reducer —YueXin
  • chain grate boiler speed reducer —YueXin
  • chain grate boiler speed reducer —YueXin
  • chain grate boiler speed reducer —YueXin
  • chain grate boiler speed reducer —YueXin

Chain grate boiler speed reducer

speed reducer

Description

Reference: Liyang Sunan Machinery Co., Ltd.


Brief:

The location of the big belt pulley of GL-P series fire grate speed reducer adopt Stift overload clutch, As shown in Figure 4, Outer Circle 1 drove by belt, and Inner Circle 2 connected by flat key and input axis of the speed reducer. Safety pin that connect out- er circle to inner circle can be cut off when overload trouble occur- red so as to stop the speed reducer and the fire grate. Besides, Safety pin should replace at regular intervals.

 

Procedure of changing safety pin:

1. Turn off the power.

2. Loosen the screw and move away the plate.

3. Take out the safety cover and broken pin, checkup the agility of outer ring 1 and inner ring.

4. Change the safety pin and aim the safety boles of the outer and inner cycles and out in a new safety pin.

5. Put the gland on its position. Tighten the screw and then start-up power.

 

Specification:

GL-5P, GL-5PA, GL-10P, GL-16P, GL-20P, GL-30P, GL-40P, GL-50P, GL-60P, GL-80P, GL-100P, GL-120P


GL-P 1.png

GL-P 2.png

GL-P 3.png

GL-P 4 (42).png

GL-P 5 (43).png

GL-P 6.png